Wong Project

Project Summary

This project will involve a bedroom, laundry room, bathroom and mud room.  Each of these areas will be completely redone including leveling a bedroom floor that has a 3 inch slope. In the bathroom we will be converting a tub to a walk-in shower.  The laundry room will now have much needed storage space with the custom cabinetry that will be installed.

#ProjectsInProgress #WongProject

Another home remodel project for JBC is underway. As always we start with some serious demolition. We’ve officially destroyed the old bathroom. Now it’s time to start building a new one!

#ProjectsInProgress #WongProject

A previous renovation left this bedroom floor sloping so in order to make the floor level we had to install a series of 2×4’s to make it level again. We also added poly on top of the concrete slab for a vapor barrier and installed 1” rigid insulation to keep the floor warm and cozy!

#ProjectsInProgress #WongProject

Bedroom floor is now leveled and sheeted!

#ProjectsInProgress #WongProject

We are starting to frame around the ducting!

#ProjectsInProgress #WongProject

We’ve almost completed the drainage to the bathroom and floor drain for the mechanical room.

#ProjectsInProgress #WongProject

The Rinnai on-demand water heater is installed. They will NEVER run out of hot water again!

#ProjectsInProgress #WongProject

The bathroom plumbing rough-in is complete, concrete patch complete, waterline installation complete!

#ProjectsInProgress #WongProject

We recommended installing Roxul insulation in the joist cavities to help maximize sound proofing.

#ProjectsInProgress #WongProject

Today we start dry walling. The donnacona and resilient channel on the ceiling help maximize sound proofing by creating an air gap to alleviate the transmission of sound vibrations. 

#ProjectsInProgress #WongProject

First coat of paint done and done!

#ProjectsInProgress #WongProject

We’re ready to start the process of waterproofing the shower and installing tile. Giddy-up!

#ProjectsInProgress #WongProject

The bathroom shower tile is complete. Next up… shower glass, vanity counter tops, accessories and plumbing finish! 

#ProjectsInProgress #WongProject

The laundry area is nearing completion! We’re just countertops and a backsplash away from being done in this room.

#ProjectsInProgress #WongProject

The laundry counter top is in. Now we’re cutting a hole for the sink.