Dodd Project

Project Summary

We will be completely transforming this basement into an open concept legal suite.  Walls will be removed including a main bearing wall.  Creating this open concept will require a major steel beam with steel columns. 

#ProjectsInProgress #DoddProject 

JBC is about to start a new project and we are about to DESTROY (demolish) this old kitchen to create something spectacular!

#ProjectsInProgress #DoddProject 

First day of demolition is going smoothly and even looking pretty clean…that’s how we do it!

#ProjectsInProgress #DoddProject 

Well the old kitchen is officially gone. Time to start rebuilding this space into something spectacular!

#ProjectsInProgress #DoddProject 

The destruction continues. The downstairs bathroom is getting ready for a major facelift!

#ProjectsInProgress #DoddProject 

We’re cutting the concrete slab to make room for the drainage of the new kitchen sink!

#ProjectsInProgress #DoddProject 

We’re cutting more concrete! This time it is so we can add a footing to support a new steel beam point load.

#ProjectsInProgress #DoddProject 

In order to accommodate the new design and an added French door we had to relocate the original two windows on the back exterior wall.

#ProjectsInProgress #DoddProject 

We had to install a 16” thick footing to help support the weight of the steel beam that will be installed in the basement to help create an open concept kitchen living room area.

#ProjectsInProgress #DoddProject 

To support the beam on the inside of the house we have reinforced the footing and are ready for concrete.

#ProjectsInProgress #DoddProject 

With the addition of a new bathroom we had to install a new drainage pipe for the plumbing.

#ProjectsInProgress #DoddProject 

Drainage is installed for the kitchen island sink!

#ProjectsInProgress #DoddProject 

The concrete for the reinforced footing is done and setting. 

#ProjectsInProgress #DoddProject 

This basement suite will be warm and toasty thanks to this newly installed gas fireplace.

#ProjectsInProgress #DoddProject 

The main structural steel beam has arrived! We’ll use a 70’ crane to lift the beam and the Genie lifts over the fence, into the backyard. Pretty cool stuff!

#ProjectsInProgress #DoddProject 

Heads up! Here’s the 70’ crane in action moving our beam from the front of the house to the backyard, where we will use the Genie lifts to roll the beam into place.

#ProjectsInProgress #DoddProject 

Genie lifts being craned into the backyard.

#ProjectsInProgress #DoddProject 

A few last minute measurements to ensure the beam is a perfect fit!

#ProjectsInProgress #DoddProject 

Voila…the beam is in!

#ProjectsInProgress #DoddProject 

The bathroom plumbing is roughed in.

#ProjectsInProgress #DoddProject 

The new exterior windows have been installed thanks to our friends @StarlineWindows!

#ProjectsInProgress #DoddProject 

Concrete poured around the base of the new column to support the steel beam.

#ProjectsInProgress #DoddProject 

We added ROXUL SAFE insulation in between ceiling joists to help with soundproofing and fire resistance. Let’s not forget this is a basement suite and sound proofing is critical!

#ProjectsInProgress #DoddProject 

The bathroom is fully insulated and ready for drywall.

#ProjectsInProgress #DoddProject 

The drywall installation is complete and ready for mud and tape. 

#ProjectsInProgress #DoddProject 

Now that the tape and mud on the walls is done and dry…we’re getting ready for the first coats of paint.

#ProjectsInProgress #DoddProject 

We’ve started waterproofing the bathroom shower.

#ProjectsInProgress #DoddProject 

The trim for the windows and door are done and looking good! Next up? First coat of paint for the walls and trim.

#ProjectsInProgress #DoddProject 

The new exterior stucco is coming along nicely!

#ProjectsInProgress #DoddProject 

The kitchen cabinets are installed and ready to be measured for countertops.

#ProjectsInProgress #DoddProject 

The vinyl plank flooring installation is well underway and nearing completion. Nice floors!

#ProjectsInProgress #DoddProject 

We’re close to completing the shower tile installation…just waiting for the quartz bench and window sill pieces to wrap this baby up!

#ProjectsInProgress #DoddProject 

The countertop measure in progress.

#ProjectsInProgress #DoddProject 

The custom fireplace cabinetry is coming to life! We’ll be installing a custom mantle above the fireplace to finish things off.

#ProjectsInProgress #DoddProject 

The ensuite cabinetry is installed and ready for a countertop.

#ProjectsInProgress #DoddProject 

We’ve installed custom cabinetry in the laundry room to make this space as functional as possible.

#ProjectsInProgress #DoddProject 

The Laundry room/bathroom is just about all finished up!

#ProjectsInProgress #DoddProject 

Ensuite vanity countertop installed! Next up…. custom mirror and surface lights over the vanity!

#ProjectsInProgress #DoddProject 

Looking good! The kitchen countertops and backsplash are installed!